On June 11, a Special Congregational meeting was held to discuss repair work to the steeple.
A motion was made and passed unanimously to hire Krause Konstruction Company of Coon Valley, WI, to replace the steeple roof at the cost of $80,580 with the following specifications:
- Remove all roofing materials from the entire steeple.
- Replace any missing or rotten wood.
- Install High Temp Ice and WaterShield to all roof surfaces.
- Fabricate and install new copper roof edging, valleys, and flashings.
- All flashings will be fabricated from 16 oz. copper.
- Copper joints will be riveted and soldered.
- Fabricate and install copper ridges, ornament, and cross.
- Install DaVinci Single Width (12’’) Synthetic Slate.
- Fabricate and install 4 corner copper cupolas.
- Fabricate and install new white fascia on steeple.
The following points were raised during discussion of the motion:
-The steeple can be lighted for an estimated $4,000 to $6,000.
-The new slate will be covered by the church’s insurance.
-The steeple roof cannot be installed until September.
-The bid includes disposal of all old roofing materials.
-$15,000 is available and set aside for this project.
-$30,000 is available from the sale of the second parsonage.
-$35,000 is available from government Employee retention Funds
A second motion was made and passed unanimously to replace the 12 copper ornaments, an estimated cost of $14,000 to $15,000.